Tip #35 – Incorporating Double Canons into Works

Before explaining how to build a double canon into a work of music, one needs to know the definition of one.

Simply, it is when two canons (including their own pair of leader and follower) are played at the same time.

Similarly, when there are three different unique canons playing at the same time, it is called a triple canon; and so on, and so on.

Try building one canon. Once that is done, find out what best compliments the two running melodic lines. Next, get creative with the second canon while keeping in mind how each part sound to one another.

Thank you so much for taking the time to read! Feel free to comment, share, and subscribe for more daily tips below! Till next time.

Author: Bryan M. Waring

Bryan Waring is a graduate of USM's School of Music with a B.M. in Performance – Composition and is now attending Belmont University for a M.M. in Commercial Media – Composition & Arranging. During his time at USM, he studied violin with Dino Liva and composition with Dr. Daniel Sonenberg, as well as has premiered several pieces during the semiannual Composer's Ensemble concert series. In 2017, Bryan was a writer for the original musical theater work of "Molded By The Flow," directed by Paul Dresher and Rinde Eckert. Outside of school, Bryan has been involved with writing music for videogame developers at Portland's CI2 Lab, collaborating with the King Tide Party, and studying with Larry Groupé (Straw Dogs) in San Diego. Now living in Nashville. Along with composing, Bryan teaches music to children, receiving the Master Teacher Award for his work at ESF Camps; and does audio engineering for live ensembles. Besides talents in music, Bryan is a team-player in any competitive work environment; equipped with skills in leadership, organization, mathematics, creativity, communication, and managing. On the side, Bryan has worked as a model for several skilled artists in the New England area. Among his other accomplishments include obtaining the rank of Eagle Scout in April 2013 with a project of building a side parking area with guide rails for Webb Mountain Park in Monroe, CT.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: